Perkins Specialized Transportation Contracting previously moved 87 process and pipe rack modules from two Texas fabrication facilities located in Abilene, TX and Corpus Christi, TX respectively, to a west Texas gas processing plant near Fort Stockton. Although the modules weights ranged from a mere 29,687 lbs up to 237,000 lbs, the highway transportation of the bulky modules all had common issues that Perkins overcame with sound engineering and superior equipment.