Explaining the planning, engineering, permitting, execution and results of our projects as we understand the customer's challenges, we can use our strong relationships and experience to protect the plan, the cargo, and the public every time.
Perkins was contracted by a leading international supplier of industrial gases to move four (4) cryogenic storage tanks from a fabricator in Mont Belvieu, TX to Dawson Creek, BC. The first pair of storage tanks were transported together and all four were moved safely and to the satisfaction of our client during AB spring road bans.
Perkins Specialized Transportation Contracting was pleased to have been contracted to provide transportation of these Advance Gun System gun mount assemblies to Bath, ME for this important defense project. The first of the four AGS gun mount assemblies was built in Fridley, MN and was delivered to the West Desert Test Center at Dugway Proving Grounds located 85 miles southwest of Salt Lake City, UT for test firing.
Perkins STC contracted with a major power plant equipment manufacturer to transport one of its new power packages to a job site in South Dakota. The power package, consisting of a turbine skid came in at a hefty 372,000 lbs and its 366,000 lb generator had been barged up the Mississippi River from the manufacturer's Houston, TX facility to a privately owned barge-unloading site in Rosemount, MN.
Immediately upon arrival from Germany to City Docks in Houston, TX, Perkins set its experienced superintendents and crew with the task of the initial assembly of the latest hydraulic platform trailer innovation available on the international market for moving super-loads over the highways of North America, our Goldhofer dual lane hydraulic trailers!