Explaining the planning, engineering, permitting, execution and results of our projects as we understand the customer's challenges, we can use our strong relationships and experience to protect the plan, the cargo, and the public every time.
Perkins was selected by a major industrial boiler manufacturer to move a series of five D-style boilers for them into northern Alberta to be used to support living conditions in that region's harsh winter climate. While not particularly heavy at only 178,000 lbs each, the boiler's physical characteristics provided their own challenges.
Perkins STC contracted with a major power plant equipment manufacturer to transport one of its new power packages to a job site in South Dakota. The power package, consisting of a turbine skid came in at a hefty 372,000 lbs and its 366,000 lb generator had been barged up the Mississippi River from the manufacturer's Houston, TX facility to a privately owned barge-unloading site in Rosemount, MN.